Are you a builder or a mall owner facing the challenging problem of building parking spaces for your upcoming project? Researched too much on the internet and confused about which type of multi-level parking system or automated parking will suit best for your clientele’s needs? Do you want optimum utilization of space, lower construction and maintenance costs and eco-friendly, low-carbon emission solutions for your establishment’s parking needs?
Congratulations! You have arrived at the right place. Expert parking solutions are ready to take all your needs into consideration and provide a one-stop solution right from conceptualization of the parking space to designing, manufacturing and installation of parking facility in your upcoming project. We even provide post-installation maintenance to cover later needs that arise from time to time.
1. Conceptualization
Our team experts sit with you to identify, define and articulate the challenges you need to address. We gather complete information, conduct background research, collect data and relevant insights regarding the site, and the surroundings. We determine the parking needs of the residents and visitors and aided by the creative thinking of our team evaluate the feasibility and impact of each type of parking solution. Our goal is to identify the most promising solution that aligns with our customer’s priorities and needs.
2. Designing
Designing of the parking lot is done keeping in mind the number of vehicles needed to be accommodated in the parking area along with any specific needs like accessibility for disabled individuals. Before designing, a thorough survey of the location is conducted to understand the terrain, the existing buildings or parking areas and any potential obstacles that may affect the design. The layout is properly planned with clear entry and exit points, sufficient space for turning and maneuvering the vehicle, smooth traffic flow and designated one-way lanes to minimize congestion. Designs include a number of levels, parking spaces, dimensions, material to be used and safety features. The number of parking spaces, vehicle dimensions, floor height and overall layout of the parking system are considered. Designated walkways, crossways and proper lighting systems are designed to ensure the safety and accessibility of both pedestrians and drivers. We ensure that the design complies with local building codes, zoning regulations and accessibility standards. Our experts anticipate potential future growth and design to accommodate additional spaces if needed in the future.
3. Manufacturing
The manufacturing of the parking solution starts by obtaining the necessary permits and following local regulations. Site preparation is done to create a level surface for the parking area. Installation of dreams and groundwork for various utilities like electricity, lightning and water supply is done. Appropriate materials as discussed with the customer like as asphalt, concrete, steel and mechanical components are used to install the pavement according to the design plan. From columns, beams and platforms to lifts, conveyors, robotic systems and other Mechanical parts, everything is manufactured with precision.
4. Installation
Utmost care is taken in the installation of the multi-level parking system. Both mechanical and automated parts are assembled and installed. Moving and positioning of vehicles are made efficient and accurate by the precise use of lifts, turn tables, conveyors and robotics systems. Safety features like emergency exits, ventilation systems, fire exits and fire protection system are put in to comply with safety regulations. Efficient lighting systems are installed to provide power and light. Electrical and control systems like sensors, automation components and safety features are set up and rigorous safety tests are performed on the site. A clear signature system is provided for the ease of drivers. Thorough functional tests are carried out to verify the proper operation of the entire parking system. Once the installation is complete, the parking system is handed over to the client or the facility management team.
5. Post-installation maintenance
For the smooth and safe operation of a multi-level parking system, post-installation maintenance is vital. Our expert parking team conducts regular inspections of the entire parking system checking mechanical components, electrical systems, structural wear and tear and safety features to ensure against malfunction. Routine lubrication is provided to all the moving parts to check wear and tear and prevent friction. Our post-installation maintenance team schedules inspections at regular intervals to check for servicing and safety systems like emergency stop buttons, fire suppression systems and safety barriers. Replacing damaged parts and conducting repairs is our top priority. Detailed records of maintenance activities, repairs and upgrades are maintained. Our team emphasizes preventive maintenance to identify and address any potential problems before they arise and escalate. Our goal is to extend the life span of your parking system, optimizing its performance and providing a positive experience for the users.